Brick Work
Brick work is an important part of construction work done with the help of bricks and cement mortar. It is donewith different quality of bricks with different ratios of cement mortar according to the requirement.It is done indifferent parts of the building/structure according to the requirement architectural design of the buildings as given below:-Brick work in foundation
Brick work in foundation is done to transfer the load ofsuper structure to the ground. The width of the brick workin foundation is taken according to the load coming on it. Theload of super structure is divided into various steps of brickworks in foundation below plinth level. Care may be taken that
all steps should accommodate in the ground. The foundationshould be madeaccording to the drawing and design.
Brick work in super structure
Brick work above plinth level is called brick work in super structure. Brick work in super structure
transfer the load of RCC beam and slabs to the foundation of the walls. Doors, windows an ventilators are accommodated in this part of brick work. This part of the building is used to divide the space into required room etc. Outer walls may be used for ornamental design of the building.
Brick work in parapet
Brick wall constructed on roof slab on terrace is called parapet walls. Parapet walls are necessary to
protect persons using terrace from falling. It is also necessary to construct parapet wall for the safety of the joints of outer wall and RCC slab. It also adds to the beauty of the building.
Brick work in partition walls/half brick walls
The partition walls are required to divide the space according to the design. The thickness of these walls is 4.5 inches. Due to thin section of the wall the usable space is increased. As there is no load on these walls so they can be changed easily when any additional/alternation is required in the building. The cost of thin walls is less hence they are economical.
Brick tiles masonry
For enhancing the beauty of buildings, the exterior/exposedsurface of wall is constructed with the brick tiles according to the architectural drawings. For making this design brick tile masonry is done on required walls which is shown in the elevation of drawings.
Brick jali
Brick Jali is constructed to enhance the beauty of the building. In veranda brick Jali gives extra air and light and protects from rain up to some extant. It saves the cost of the walls.
Brick work in arch
Arch is constructed to beautify the building. These are provided in openings to save the cost of RCC lintel.
Brick work according to cement mortar ratio
1. First class brick work in cement sand mortar 1:4
Brick walls constructed with cement sand mortar 1:4 ratio means 1 part of cement and 4 parts of sand. This mortar is of high strength and is recommended for following construction works.
Multi storey buildings
Heavy weight /load bearing walls
In earth quake zones
Brick pillars
Where there is more vibration due to heavy traffic or factory.
Boundary wall, courtyard wall parapet wall and other free end walls
Partition or 4.5 inch thick walls
Brick works used for drainage
2. First Class Brick Work in cement sand mortar 1:6
Brick walls constructed with cement sand mortar 1:6 ratio means 1 part of cement and 6 parts of sand. This mortar is of medium strength and is recommended for following construction works.
Three storey buildings
Load bearing walls
Heavy and frequent rainy zones
Foundation of multi storey buildings
3. First Class Brick Work 1:7
Brick walls constructed with cement sand mortar in the ratio of 1:7 means 1 part of cement and 7 parts of sand.This mortar is low in strength and is recommended for following works.
Toe walls
Single storey buildings
Temporary structures
Light weight walls having no load of beams etc.
Note: Mortar richer than 1:3 are not used in masonry because of high shrinkage and no appreciable gain in strength of masonry although mortar strength itself may increase.
Common defects in brick work and cement mortar
1. Raw materials like brick, sand, cement and water are of sub standard quality without qualifying any
test.
2. Bricks are not soaked in water properly.
3. The joints in brick works are thicker, unfilled properly.
4. Raking of mortar is not done when the mortar is green.
5. Bricks bats are used in masonry work.
6. Mortar is not mixed properly on platform.
7. There is improper mixing of cement mortar
8. There is excessive water content in mortar
9. Brick work is not in plumb, level and straight line.
10. Mortar is not according to the structural requirements.
11. There are gaps between door/window frame and masonry.
12. The holes of scaffolding are not filled in with mortar properly.
13. Vertical joints in brick work are hollow.
14. There is high suction of brick and less water retention of mortar
15. There are uneven joints in brick works
16. There are voids in vertical joints
17. There are disturbances of brick works just after the layout
18. Over thick joints reducing the strength of brick work.
Precautions in brick work
1. The length and width of the walls should be according to the drawings.
2. The quality of bricks should be good having required strength and should not show any efflorescence
(salt on face).
3. The sand should not have fine grains and be free from silt etc. The sand used for brick mortar should be
of required FM (Coarser) with no silt.
4. The mixing of mortar should be proper with required quantity of water. It should not be dry or liquid.
5. The opening of doors and windows should be left simultaneously, not by dismantling.
6. During the brick work in a building the Rain water and Sanitary pipes should be fixed during the brick work
other wise the brick work would have to be dismantled to fix the pipes.
7. The bricks are soaked in water before use otherwise these will absorb water from the mortar and the
bonding will be weak
8. The water should penetrate to the core of the brick but the brick should be skin dry i.e. from outside when
it’s used in actual.
9. The frog or depression side of the brick should be upwards.
10. Minimum number of bats is used.
11. Bricks are absolutely aligned horizontally and in a straight line. This can be checked by a stretched string
across the face.
12. The bricks are vertically aligned which can be checked with a plumb bob.
13. The courses or layers of bricks are level. This can be checked with a spirit level.
14. The thickness of joints is not more than 1 cm.
15. The joints should be filled with mortar fully without any gaps.
16. The joints are pushed inside when cement mortar is still wet so that later plastering can be done
effectively.
17. Brick work should be kept wet for seven days so that the mortar may gain its full strength.
18. There are no continuous vertical joints
19. Bricks, sand and cement used in brick work should be according to their specifications
Tools recommended for brick work
1. Wooden setting out square
2. Spirit level
3. Water level
4. Boning rod
5. Plumb rule
6. Laying trowel
7. Brick hammer
8. Lump hammer and bolster chisel.
9. Double end comb hammer
10. Straight edge
11. Brick work gauge rod
12. Checking the accuracy of spirit plumb level
ईंट का काम
ईंट का काम ईंटों और सीमेंट मोर्टार की मदद से किए गए निर्माण कार्य का एक महत्वपूर्ण हिस्सा है। यह आवश्यकता के अनुसार सीमेंट मोर्टार के विभिन्न अनुपातों के साथ ईंटों की अलग-अलग गुणवत्ता है। यह नीचे दिए गए भवनों की आवश्यकता वास्तुशिल्प डिजाइन के अनुसार भवन / संरचना के उदासीन भागों के लिए किया जाता है: -
नींव में ईंट का काम
नींव में ईंट का काम जमीन पर संरचना के लोड को स्थानांतरित करने के लिए किया जाता है। ईंट वर्किन फाउंडेशन की चौड़ाई उस पर आने वाले भार के अनुसार ली जाती है। सुपर संरचना का भार प्लिंथ स्तर से नीचे नींव में ईंटवर्क के विभिन्न चरणों में विभाजित है। ध्यान रखा जा सकता है कि
सभी चरणों को जमीन में समायोजित करना चाहिए। नींव ड्राइंग और डिजाइन के लिए मैडेकॉर्डिंग होगी।
सुपर स्ट्रक्चर में ईंट का काम
प्लिंथ स्तर से ऊपर ईंट के काम को सुपर स्ट्रक्चर में ईंट वर्क कहा जाता है। सुपर स्ट्रक्चर में ईंट का काम
आरसीसी बीम और स्लैब के भार को दीवारों की नींव में स्थानांतरित करें। दरवाजे, खिड़कियां एक वेंटिलेटर को ईंट के काम के इस हिस्से में समायोजित किया गया है। भवन के इस हिस्से का उपयोग अंतरिक्ष को आवश्यक कमरे आदि में विभाजित करने के लिए किया जाता है। बाहरी दीवारों का उपयोग भवन के सजावटी डिजाइन के लिए किया जा सकता है।
पैरापेट में ईंट का काम
छत पर छत के स्लैब पर निर्मित ईंट की दीवार को पैरापेट दीवार कहा जाता है। पैरापेट दीवारें आवश्यक हैं
छत का उपयोग करने वाले व्यक्तियों को गिरने से बचाएं। बाहरी दीवार और आरसीसी स्लैब के जोड़ों की सुरक्षा के लिए पैरापेट दीवार का निर्माण करना भी आवश्यक है। यह इमारत की सुंदरता में भी इजाफा करता है।
विभाजन की दीवारों / ईंट की दीवारों में ईंट का काम
विभाजन की दीवारों को डिजाइन के अनुसार अंतरिक्ष को विभाजित करने की आवश्यकता होती है। इन दीवारों की मोटाई 4.5 इंच है। दीवार के पतले हिस्से के कारण प्रयोग करने योग्य स्थान बढ़ जाता है। चूंकि इन दीवारों पर कोई भार नहीं है, इसलिए भवन में किसी भी अतिरिक्त / वैकल्पिक की आवश्यकता होने पर उन्हें आसानी से बदला जा सकता है। पतली दीवारों की लागत कम है इसलिए वे किफायती हैं।
ईंट टाइल चिनाई
इमारतों की सुंदरता बढ़ाने के लिए, दीवार के बाहरी / उजागर वास्तुशिल्प चित्रों के अनुसार ईंट टाइलों के साथ निर्माण किया जाता है। इस डिज़ाइन को बनाने के लिए ईंट की टाइल की चिनाई आवश्यक दीवारों पर की जाती है, जो चित्र की ऊँचाई में दिखाई जाती है।
ईंट जली
भवन की सुंदरता को बढ़ाने के लिए ईंट जली का निर्माण किया जाता है। बरामदा ईंट में जली अतिरिक्त हवा और प्रकाश देता है और कुछ अतिरिक्त तक बारिश से बचाता है। यह दीवारों की लागत को बचाता है।
ईंट का काम आर्क में
इमारत को सुशोभित करने के लिए आर्क का निर्माण किया जाता है। ये आरसीसी लिंटेल की लागत को बचाने के लिए ओपनिंग में प्रदान किए जाते हैं।
सीमेंट मोर्टार अनुपात के अनुसार ईंट का काम
1. सीमेंट रेत मोर्टार 1: 4 में प्रथम श्रेणी की ईंट का काम
सीमेंट रेत मोर्टार 1: 4 अनुपात के साथ निर्मित ईंट की दीवारें सीमेंट के 1 भाग और रेत के 4 भागों का मतलब है। यह मोर्टार उच्च शक्ति का है और निर्माण कार्यों के लिए इसकी सिफारिश की जाती है।
बहुमंजिला इमारतें
भारी वजन / भार वाली दीवारें
पृथ्वी भूकंप क्षेत्रों में
ईंट के खंभे
जहां भारी यातायात या कारखाने के कारण अधिक कंपन होता है।
बाउंड्री वॉल, आंगन की दीवार पैरापेट दीवार और अन्य मुक्त अंत दीवारें
विभाजन या 4.5 इंच मोटी दीवारें
जल निकासी के लिए उपयोग किए जाने वाले ईंट के काम
2. प्रथम श्रेणी ईंट ईंट सीमेंट मोर्टार में काम 1: 6
सीमेंट रेत मोर्टार 1: 6 अनुपात के साथ निर्मित ईंट की दीवारों का मतलब सीमेंट का 1 हिस्सा और रेत के 6 हिस्से हैं। यह मोर्टार मध्यम शक्ति का है और निर्माण कार्यों के लिए इसकी सिफारिश की जाती है।
तीन मंजिला इमारतें
भार वाली दीवारें
भारी और लगातार बारिश वाले क्षेत्र
बहुमंजिला इमारतों का फाउंडेशन
3. फर्स्ट क्लास ब्रिक वर्क 1: 7
1: 7 के अनुपात में सीमेंट रेत के मोर्टार और रेत के 7 भागों के साथ निर्मित ईंट की दीवारें। यह मोर्टार ताकत में कम है और निम्नलिखित कार्यों के लिए अनुशंसित है।
पैर की दीवारें
एकल मंजिला इमारतें
अस्थायी संरचनाएँ
हल्के वजन की दीवारें जिनमें बीम आदि का भार नहीं है।
नोट: 1: 3 से अधिक मोर्टार अमीर उच्च संकोचन के कारण चिनाई में उपयोग नहीं किए जाते हैं और चिनाई की ताकत में कोई सराहनीय लाभ नहीं है, हालांकि मोर्टार की ताकत में वृद्धि हो सकती है।
ईंट के काम और सीमेंट मोर्टार में सामान्य दोष
1. कच्चे माल जैसे ईंट, रेत, सीमेंट और पानी बिना किसी योग्यता के उप मानक गुणवत्ता के हैं
परीक्षा।
2. ईंटों को पानी में ठीक से भिगोया नहीं जाता है।
3. ईंट के काम में जोड़ों को मोटा, ठीक से पूरा नहीं किया गया है।
4. मोर्टार का रेकिंग तब नहीं किया जाता जब मोर्टार हरा होता है।
5. ईंटों के चमगादड़ों का इस्तेमाल चिनाई के काम में किया जाता है।
6. मंच पर मोर्टार को ठीक से नहीं मिलाया जाता है।
7. सीमेंट मोर्टार का अनुचित मिश्रण है
8. मोर्टार में पानी की मात्रा अधिक होती है
9. ईंट का काम बेर, समतल और सीधी रेखा में नहीं है।
10. मोर्टार संरचनात्मक आवश्यकताओं के अनुसार नहीं है।
11. दरवाजे / खिड़की के फ्रेम और चिनाई के बीच अंतराल हैं।
12. मचान के छेद ठीक से मोर्टार से भरे नहीं हैं।