Construction Stages

                                                                          Construction Stages

1.      Excavation

a.      9” brick work=3’X3’ (assumed at 3’-0” level we will get hard soil)

b.      4.5” brick work=2’-6”X2’-6”

c.      Columns= as per structural drawing, should be atleast 4’-6” down

2.      Termite treatment

a.      Bayer’s premises

b.      Biflex TC

3.      P.C.C. or Red Brick Ballast (4”-5” thick), stone aggregate is recommended

4.      Brick Work

a.      9” wall= 27”,22.5”,18”,13” then plinth beam 9” thick then 9” brick work

b.      4.5” wall= 22.5”, 18”, 13” then plinth beam 9” thick then 9” brick work

5.      Plinth beam (on road level, sewerage pipes should not cut plinth beam)

6.      4.5” walls of shorter span will be raised from plinth beam

7.      D.P.C. level atleast 2” thick

8.      Water Proofing

a.      Dr fixit pidicrete urp

b.      Cico (all these compounds should be applied with fibre mesh for better strength)

9.      Wooden frames (if malasiyan saal frames will be fitted at the time of construction, if teak then frames will be fitted after civil work but we have to purchase wood before time for seasoning purposes.)

10.   Vertical stacks (all pipes will be 4” thick, 6 kg pressure recommended)

11.   Lintel beams (8’-0” level)

12.   Shuttering, toilet on first floor will be sunk

13.   Electrical plans and air conditioning pipeline provision

14.   Slab (5” thickness recommended)

15.   First floor civil work

16.   Second floor civil work

17.   Wall electrical fitting work as per our furniture

18.   Plumbing work as per Toilet layouts

19.   Plumbing work as per Kitchen layout

20.   Plumbing work in Washing area

21.   Security system fittings (camera, video door phone etc)

22.   Gas pipeline fitting

23.   Air conditioning pipeline fitting

24.   Plaster work (With thick sand or coresand should be mixed in fine sand)

25.   Water proofing (roof and sunken areas)

26.   Sewerage pipe line fitting

27.   Boring for Rain water harvesting/earthing/Genset

28.   Earth filling- level should be 8” down from D.P.C. level (3” fine sand, 3” P.C.C., 2” for flooring)

29.   Termite treatment

30.   Kaccha floor (P.C.C.)

31.   False ceiling work

32.   Flooring

33.   Wooden work (wooden work, False ceiling and flooring can be started simultaneously)

34.   Paint polish work

35.   Toilet fixture fitting

36.   Glass work.

37.   Electrical fixtures fittings.                                                    

Comments

Post a Comment

If you have any doubts,please let me know.

Popular posts from this blog

MACHINE FOUNDATION.

MACHINE FOUNDATION. The design of machine foundation involves careful study of the vibration characteristics of the foundation system. Relevant data for the design and construction of the foundation of machine should be obtained from the manufacturer of the machine , prior to the start design.  All parts of machine foundation should be designed for maxim stresses due to the worst combination of vertical loads, torque, longitudinal and transverse forces, stresses due to temperature variation and the foundation dead load. In case, the foundation layout is partly built up of beam and column construction , straight bars should be provided both at top and bottom of the beams and the spacing of the stirrups should be close. The main foundation block should have the designed thickness and should be reinforced both at top and bottom even if the reinforcements are not required from design considerations. Machine foundations  are special types of  foundations  required fo...

Concrete Mix Design

Concrete Mix Design Concrete mix design is the method of optimally dosing various components of concrete,such as cement, aggregates, water,and additives, to make concrete less costly and will have specific  workability and homogeneity properties in the fresh state and strength and durability in the hardened state. Purpose of concrete mixes The main objective of the dosage of concrete mixes is to make a concrete that has the following characteristics: 1. Satisfy viability requirements in terms of drop to facilitate placement and consolidation. 2. Meets resistance requirements. 3.  Can be mixed, transported, placed and compacted efficiently. 4. Economical to manufacture. 5. Meets durability requirements to withstand the environment in which the structure is expected to serve Mixing ratio procedure Step 1. Calculate the target average compressive strength for the mixing ratio: The target 28-day average compressive strength according to clause 3.2 of IS 10262. ft = fck + 1.65...

Column

Column.  A column may be defined as an isolated vertical load bearing member the width of which is neither less than its thickness nor more than four times its thickness. Pier is a vertical load bearing member similar to a column except that it is bonded into load beating wall at the sides to form an integral part and extends to full height of the wall. A pier is introduced to increase the stiffness of the wall to carry additional load or to carry vertical concentrated load. Pier also strengthens the wall to resist lateral pressure without buckling. a supporting pillar especially : one consisting of a usually round shaft, a capital, and a base a colonnade of marble columns. something resembling a  column  in form, position, or function a  column  of water columns of smoke. The  row  is an order in which people, objects or figures are placed alongside or in a straight line. A vertical division of facts, figures or any other details based on category, ...