WALLPAPER HANGING GUIDE

BEFORE 

· Remember to account for pattern repeat
· Always use paste suitable for non-woven wallpaper
· Check that all rolls of wallpaper have the same batch number. Be sure to buy enough rolls with matching batch numbers in order to get the same colour on all rolls (the batch number is printed on the label).
· If you have large colour differences on wall, the wall must be primed before hanging the wallpaper (primarily when using bright wallpaper).

TOOLS

Following tools are good too have
  1. Scissors
  2. Pencil
  3. Roller
  4. Paint Brush
  5. Tray
  6. A bowl of Water
  7. Sponge
  8. Spatula
  9. Scraper
  10. A sharp Knife

GUIDE

A. Apply paste onto the wall with a roller. Put on paste for about 2-3 lengths at a time. Use a brush to apply paste by ceiling, floor and edges.
B. Pull up one length of wallpaper directly from the roll/floor, and hang it on the pasted wall. Make sure you have a few extra centimeters of wallpaper at the ceiling and floor and make sure that the wallpaper hangs straight.
C. Make sure that the wallpaper hangs correctly by hanging a pair of scissors on a string from the ceiling.
D. Smooth the section of wallpaper from the top down and from the centre outwards. Use a wallpaper brush or spatula and make sure that all air bubbles are removed.
E. Trim excess wallpaper using a sharp wallpaper knife.
F. Hang the next section by butting the edges together. Make sure that the pattern matches across the two sections. Wash away excess paste with a damp, soft sponge. Do not rub.

AFTER
· Make sure to ventilate the room well to make the wallpaper dry.
· The wallpaper is washable. If needed, wipe off with a damp sponge.
· Wipe off vertically and do not rub.

इससे पहले

· पैटर्न दोहराने के लिए याद रखें
· हमेशा गैर-बुना वॉलपेपर के लिए उपयुक्त पेस्ट का उपयोग करें
· जांचें कि वॉलपेपर के सभी रोल में एक ही बैच नंबर है। सभी रोल पर समान रंग प्राप्त करने के लिए बैच नंबर के साथ पर्याप्त रोल खरीदना सुनिश्चित करें (लेबल पर बैच नंबर मुद्रित है)।
· यदि आपके पास दीवार पर बड़े रंग के अंतर हैं, तो वॉलपेपर लटकाए जाने से पहले दीवार को भड़कना चाहिए (मुख्य रूप से उज्ज्वल वॉलपेपर का उपयोग करते समय)।

उपकरण

निम्नलिखित उपकरण बहुत अच्छे हैं
कैंची
पेंसिल
बेलन
पेंट ब्रश
ट्रे
पानी का एक कटोरा
स्पंज
रंग
खुरचनी
एक तेज चाकू

मार्गदर्शक

A. दीवार पर एक रोलर के साथ पेस्ट लागू करें। एक बार में लगभग 2-3 लंबाई के लिए पेस्ट लगाएं। छत, फर्श और किनारों से पेस्ट लगाने के लिए ब्रश का उपयोग करें।
B. रोल / फर्श से सीधे वॉलपेपर की एक लंबाई खींचें, और इसे चिपकाई गई दीवार पर लटका दें। सुनिश्चित करें कि आपके पास छत और फर्श पर वॉलपेपर के कुछ अतिरिक्त सेंटीमीटर हैं और सुनिश्चित करें कि वॉलपेपर सीधे लटका हुआ है।
सी। सुनिश्चित करें कि वॉलपेपर छत से एक स्ट्रिंग पर कैंची की एक जोड़ी लटकाकर सही ढंग से लटका हुआ है।
डी। ऊपर और नीचे से केंद्र से वॉलपेपर के अनुभाग को चिकना करें। वॉलपेपर ब्रश या स्पैटुला का उपयोग करें और सुनिश्चित करें कि सभी हवाई बुलबुले हटा दिए जाते हैं।
ई। एक तेज वॉलपेपर चाकू का उपयोग करके अतिरिक्त वॉलपेपर ट्रिम करें।
एफ। किनारों को एक साथ जोड़कर अगले अनुभाग को लटकाएं। सुनिश्चित करें कि पैटर्न दो वर्गों में मेल खाता है। नम, नरम स्पंज के साथ अतिरिक्त पेस्ट को धो लें। मलो मत।

उपरांत
· वॉलपेपर को शुष्क बनाने के लिए कमरे को अच्छी तरह से हवादार करना सुनिश्चित करें।
· वॉलपेपर धोने योग्य है। जरूरत पड़ने पर नम स्पंज से पोंछ दें।
· लंबवत पोंछें और रगड़ें नहीं।
                         
         

Comments

Popular posts from this blog

MACHINE FOUNDATION.

MACHINE FOUNDATION. The design of machine foundation involves careful study of the vibration characteristics of the foundation system. Relevant data for the design and construction of the foundation of machine should be obtained from the manufacturer of the machine , prior to the start design.  All parts of machine foundation should be designed for maxim stresses due to the worst combination of vertical loads, torque, longitudinal and transverse forces, stresses due to temperature variation and the foundation dead load. In case, the foundation layout is partly built up of beam and column construction , straight bars should be provided both at top and bottom of the beams and the spacing of the stirrups should be close. The main foundation block should have the designed thickness and should be reinforced both at top and bottom even if the reinforcements are not required from design considerations. Machine foundations  are special types of  foundations  required fo...

Concrete Mix Design

Concrete Mix Design Concrete mix design is the method of optimally dosing various components of concrete,such as cement, aggregates, water,and additives, to make concrete less costly and will have specific  workability and homogeneity properties in the fresh state and strength and durability in the hardened state. Purpose of concrete mixes The main objective of the dosage of concrete mixes is to make a concrete that has the following characteristics: 1. Satisfy viability requirements in terms of drop to facilitate placement and consolidation. 2. Meets resistance requirements. 3.  Can be mixed, transported, placed and compacted efficiently. 4. Economical to manufacture. 5. Meets durability requirements to withstand the environment in which the structure is expected to serve Mixing ratio procedure Step 1. Calculate the target average compressive strength for the mixing ratio: The target 28-day average compressive strength according to clause 3.2 of IS 10262. ft = fck + 1.65...

EARTH WORK IN EXCAVATION OF FOUNDATION.

EARTH WORK IN EXCAVATION OF FOUNDATION. Earthwork in excavation  in  foundation  trenches or drains not exceeding 1.5m in width and 10sq. m in plan including dressing of sides & ramming of bottom, disposal of surplus  excavated  soil within 50m lead & 1.5m lift. All  excavation  operation shall include  excavation  and getting out the  excavated  matter. Stability of existing structures.   Before starting excavation trial pits should be dug to ascertain the depth and nature of its foundation. Shoring should be used in all cases when the depth of excavation exceeds its distance from the existing structure.  Excavation.   Foundation trenches shall be dug out to the exact width of the foundation concrete and the sides of the trenches shall be left plumb where the nature of soil admits of it. Where the soil is not good and does not permit vertical sides, the sides Fut be sloped back or shored up carefully. No exca...