The loads Acting on staircase.

Distribution of Loads and its Effect on Staircase Stair slabs are usually designed to resist gravity loads, comprising of dead loads and live loads as described below: 
1) Dead Load: The components of the dead load to be considered are:
a) Self-weight of stair slab (tread/tread-riser slab/waist slab)
b) Self-weight of ...

LIVE LOADS:-
IS 875 parts II specifies the load to be considered as UDL of intensity 5KN/m2 for public 
buildings and 3kN/m2 for residential building where the specified floor do not exceed 2kN/m2 and the staircases are should not liable for overcrowding.

DEAD LOADS:-
Self-weight of stair slab which includes the waist slab, tread-rise,etc. Self-weight of finishes (0.5 to 1 kN/m?)

Types of stairs                                                                                            
  • Straight flight stairs.
  • Dog legged stairs.
  • Open newel stairs.
  • Quarter turn stairs.
  • Bifurcated stairs.
  • Geometrical stairs.
  • Spiral stairs.                                     

सीढ़ी का वितरण और सीढ़ी सीढ़ी पर इसके प्रभाव को आमतौर पर गुरुत्वाकर्षण भार का विरोध करने के लिए डिज़ाइन किया गया है, जिसमें मृत भार और लाइव लोड शामिल हैं:

1) डेड लोड: माने जाने वाले डेड लोड के घटक हैं:

ए) सीढ़ी स्लैब का स्व-वजन (चलने / चलने-उठने वाले स्लैब / कमर स्लैब)

बी) के स्वयं के वजन ...

लाइव लोड: -
IS 875 भाग II लोड को जनता के लिए तीव्रता 5KN / m2 के UDL के रूप में माना जाता है
आवासीय भवन के लिए भवन और 3kN / m2 जहां निर्दिष्ट मंजिल 2kN / m2 से अधिक नहीं है और सीढ़ियों को भीड़भाड़ के लिए उत्तरदायी नहीं होना चाहिए।

DEAD LOADS: -
सीढ़ी स्लैब का आत्म-वजन जिसमें कमर की पटिया, चलना-बढ़ना आदि शामिल हैं। खत्म का आत्म-वजन (0.5 से 1 kN / m?)

सीढ़ियों के प्रकार
सीधी उड़ान की सीढ़ियाँ।
कुत्ते ने सीढ़ियाँ चढ़ दीं।
नई सीढ़ियां खोलें।
क्वार्टर मोड़ सीढ़ियाँ।
द्विभाजित सीढ़ियों।
ज्यामितीय सीढ़ियाँ।
घुमावदार सीढ़ियाँ।


Comments

Popular posts from this blog

Construction Stages

                                                                            Construction Stages 1.       Excavation a.       9” brick work=3’X3’ (assumed at 3’-0” level we will get hard soil) b.       4.5” brick work=2’-6”X2’-6” c.       Columns= as per structural drawing, should be atleast 4’-6” down 2.       Termite treatment a.       Bayer’s premises b.       Biflex TC 3.       P.C.C. or Red Brick Ballast (4”-5” thick), stone aggregate is recommended 4.       Brick Work a.       9” wall= 27”,22.5”,18”,13” then plinth beam 9” thick then 9” brick work b....

How many Cement Bags Required for 200 Sq.ft Concrete Slab.

C ement Bags Required for 200 Sq.ft Concrete Slab. Concrete Slab area = 200 Sq.ft Assume Depth of Slab = 200 mm                                                = 0.2 m                                                                             = 0.65 ft.  Volume of Slab = 200 X 0.65 = 130 cu.ft  Cement content (as per IS) Min. Cement Content = 320 kg/cu.m  Max. Cement Content = 450 kg/cu.m 1 cu.m = 35.3 cu.ft  128 cu.ft = 130/35.3 = 3.682 cu.m  : Taking 400 kg/cu.m as Cement Content Casually Taken  Total Cement Content  = 400 X 3.682 = 1472.8 kg.  1 Bag Cement Wt. is 50 kg 1472.8 / 50 = 29.456 Bags   Ap...